4-5: Operating Instructions
SeTTIng THe preSSUre FOr CleanIng OperaTIOnS
Adjust the “PReSSuRe ReGulATOR” to the desired level as follows:
Carpet Cleaning:
300 to 400 psi
•
Hard Surface Cleaning:
up to 1,200 psi (or as indicated on tool)
•
The chemical pump shutoff valve can be
turned on for cleaning operations at 1,200
psi or lower.
The chemical pump shutoff valve is on when
the handle of the integrated valve is in line
with the pump (see figure 4-4).
To protect the heat exchange system,
the TMT 3000 is designed to open
the pressure relief valve if the system
registers more than 2,500 psi.
Turn the chemical pump shutoff valve
1.
to the on position (see figure 4-4).
Turn the “CHeMICAl PuMP” valve,
2.
located on the dash assembly, to the
“PRIMe” position to purge any air
from the system (see figure 4-1 on page 4-1).
With the truckmount running at “HIGH”, block off the vacuum intake to the recovery
3.
tank. The vacuum gauge should read 12” Hg. This will assist in priming the chemical
system
Allow the chemical to flow through the chemical meter at full flow for 30 seconds.
4.
Turn the “CHeMICAl PuMP” valve to “ON.” The restriction can now be removed
5.
from the vacuum inlet.
While spraying solution from the cleaning tool, adjust the chemical flow by turning
6.
the “CHeMICAl MeTeRING CONTROl” knob (see figure 4-1 on page 4-1).
Begin cleaning.
7.
Chemical pump Shutoff
Figure 4-4.
Valve Is On When Valve Handle Is In line
with Chemical pump
Valve Handle
Chemical pump