Power On and Operational Test
Before connecting the G2-PWU to AC power:
Verify that input voltage and input voltage selection jumper on G2-PWU are correct before you power up the
system.
Recheck the cabling for incorrect connections, loose wires and wiring fragments that may cause short-
circuits.
Plug the power cord into a power outlet.
Verify the system boots properly by checking the display of a telephone set.
You may now connect the battery back up unit if applicable.
Operational Tests
Check each telephone and CO line to verify that outgoing lines are connected properly.
Check that intercom calls can be made from extension to extension.
WARNING:
DISCONNECT THE POWER SUPPLY FROM THE AC POWER SOURCE BEFORE WIRING OR
CHANGING ANY WIRING.
Connect the Battery Backup
AFTER
AC power has been connected to the Power Supply.
Disconnect Battery Backup
BEFORE
disconnecting AC power from the Power Supply.
NOTICE:
ONCE THE SYSTEM OPERATES PROPERLY, PROCEED TO SYSTEM PROGRAMMING.
(REFER TO THE SYSTEM PROGRAMMING MANUAL.)
Special Immunity Protection for System and terminals
Adding a
Noise Filter
to the below points can enhance the immunity capability of the system to outside
environment noise.
For Power Supply:
For Line:
Содержание GDS-600
Страница 12: ...Issue 4 1 1 October 2014 DK6 21 DK6 31 DK6 33 DK7 21 IP 38 61 DK9 25 DK9 15 DK9 DSS ...
Страница 71: ...GDS 600 System Installation 65 ...
Страница 75: ...C Use right button of mouse to click LAN And then click Properties D Click Internet Protocol TCP IP ...
Страница 82: ...Select 56000 baud rate and select the COM port Press OK the display will show ...