GDS-600
– System Installation
59
CO/PABX Connections
Make your CO line connection to the telephone company on this
connector. Pins 3 and 4 of the connector are for the CO line.
RJ-11C (2 wire) modular connector is required.
2-conductor wiring (1 CO Line) is required on G2-TKU and 4 conductor
wiring (2 Co Lines) on G2-TKU2.
ISDN S/T Connections
Make your CO line connection to the telephone company on this connector. Pins 3 to 6 of the connector are
for the CO line.
Cable: Twisted 2 pairs
Connector Type: RJ-45 (4 wire) modular connector is required.
Connector PIN assignment: (Pin 1, 2, 7, 8 are reserved.)
Install/remove the terminators by adjusting the jumper JP1 (A, B, C) and JP2 (A, B, C) on SIU card. If there
is no other ISDN device connected after the ISDN interface of SIU card when using point to multi-point
connection, this ISDN interface port needs the terminator installed. Otherwise, remove the terminator.
Example:
The following is the point to multi-point connection.
.
The 1st ISDN interface needs the terminator because there is no other ISDN device connected after
this ISDN interface of SIU card.
.
The 2nd ISDN interface does not need the terminator because there is an ISDN Modem connected
after this ISDN interface of SIU card.
Содержание GDS-600
Страница 12: ...Issue 4 1 1 October 2014 DK6 21 DK6 31 DK6 33 DK7 21 IP 38 61 DK9 25 DK9 15 DK9 DSS ...
Страница 71: ...GDS 600 System Installation 65 ...
Страница 75: ...C Use right button of mouse to click LAN And then click Properties D Click Internet Protocol TCP IP ...
Страница 82: ...Select 56000 baud rate and select the COM port Press OK the display will show ...