Issue 4.1.1 - October 2014
9. Connect the expansion cable (long blue
‘2’) from the G2-MPU8 to the G2-IPU2 in the 2
nd
cabinet.
Connect the expansion cable (long blue
‘3’) from the G2-MPU8 to the G2-IPU2 in the 3
rd
cabinet.
…………….
Connect the expansion cable (long blue
‘8’) from the G2-MPU8 to the G2-IPU2 in the 4
th
cabinet.
10. Install all other interface cards in cabinets.
11.
It is preferred to switch on all cabinets simultaneously
OR
12. Power on the 2
nd
, 3
rd
, 4
th
, 5
th
, 6
th
, 7
th
, 8
th
cabinet.
13.
Power on the first cabinet
.
14. .
Note:
The attached expansion cables:
4. Short red expansion cable
5. Long red expansion cable
6. Long blue expansion cable
Содержание GDS-600
Страница 12: ...Issue 4 1 1 October 2014 DK6 21 DK6 31 DK6 33 DK7 21 IP 38 61 DK9 25 DK9 15 DK9 DSS ...
Страница 71: ...GDS 600 System Installation 65 ...
Страница 75: ...C Use right button of mouse to click LAN And then click Properties D Click Internet Protocol TCP IP ...
Страница 82: ...Select 56000 baud rate and select the COM port Press OK the display will show ...