5.1 | BEFORE YOU OPERATE
Before use each day or at the beginning of each shift, the machine shall be given a visual inspection and functional
test. Repairs (if any) must be made prior to operating the machine, as it is critical to ensure safe operation of the
machine. A checklist for pre-start inspection can be found in the Daily Maintenance section of this manual.
5.2 | CONTROLS
Platform Controls
Item
Control/Indicator
1
Up/Down Rotary Switch
Operation described as follows
2
Emergency Stop
Operation described in Section 2.4
3
Overload Indicator Light
4
Battery Voltage Meter
5
Lift Enable Button
Operation described as follows
6
Alarm Sounds for descent, overload
FIGURE 9: Upper Controls
SECTION 5 | OPERATION
FIGURE 10: Master Power Switch On
•
Check that the work area is safe
•
It is not recommended to
manoeuvre the unit on a slope
greater than 5°
•
Check that master power switch is
in “ON” position
•
Machine must be on a hard, level
surface before operation. Check
that bubble level is centered
•
Engage the manual breaks on the
rear casters before elevating the
platform
Master Power Switch
1
2
3
4
5
6
BY CUSTOM EQUIPMENT LLC
22
OPERATIONS & SAFETY
HB-P3.6
SUPO-725
REV C