Field Application Department
2018 . 10 . 02 (r1)
31/63
[Execute the calibration for the Pachy measurement]
※ Please verify that the CUR REF value is 1.51 before execute the Pachy calibration
1. Set the model eye in the Model eye holder JIG
2. As shown first image, adjust the HNT-1P position so that the two line signal is visible
3. Press the “Red box” as shown below
4. As shown below second image, adjust the model eye position using the adjustment knob
on the holder JIG until the center of the model eye looks brighter overall
5. Press “Red box” for return to previous screen
[HNT-1/1P] Data issue_Pachy Calibration
5) How to do calibration for Pachy
Содержание HNT-1
Страница 1: ...Field Application Department 2018 10 02 r1 1 63 HNT 1 1P Troubleshooting ...
Страница 3: ...Field Application Department 2018 10 02 r1 3 63 1 Auto Tracking issue HNT 1 1P Auto Tracking issue ...
Страница 20: ...Field Application Department 2018 10 02 r1 20 63 2 Data issue HNT 1 1P Data issue ...
Страница 34: ...Field Application Department 2018 10 02 r1 34 63 3 Connection with HRK MATE HNT 1 1P How to connect HRK MATE ...
Страница 40: ...Field Application Department 2018 10 02 r1 40 63 4 Assembly Disassembly HNT 1 1P Assembly Disassembly ...
Страница 53: ...Field Application Department 2018 10 02 r1 53 63 5 Upgrade the software HNT 1 1P Upgrade the software ...
Страница 55: ...Field Application Department 2018 10 02 r1 55 63 6 Engineer Setup Mode HNT 1 1P Engineer Setup Mode ...