4. TESTING & OPERATION
4-1
Operation Symbols
Variable adjustment
High speed
(pressure)
Clockwis
e:
1
HIGH
revolution
11
Countercloc kwi se:
pressure increase
pressure decrease
2
LOW
Low speed
12
Electrical
Revolution
control box
3
Forward
13
THREADS
Imperial threads
revolution
N
4
□
Neutral gear
14
mm
Metric threads
5
Reverse revolution
15
mm
Auto feeding
Rate per
revolution
6
Feeding
16
Pump
7
T
Intermittent
17
GREEN
Power switch-ON
button
8
Cross feeding
18
RED
Power switch-OFF
9
Longitudinal
19
OIL
Oil inlet (hole)
feeding
10
Cone clutch
10
Содержание HU 480 X 2200 VAC TOPLINE
Страница 1: ...L A T H E MODEL HU 480 X 2200 VAC TOPLINE...
Страница 5: ...1 INVERTER TRANSMISSION LATHE 1 1 Machine Assembly 4...
Страница 33: ...7 4 Lubrication Location A Oil input hole B Oil drain hole 32...
Страница 37: ......
Страница 40: ......
Страница 41: ......
Страница 42: ......
Страница 43: ......
Страница 44: ......
Страница 45: ......
Страница 46: ......
Страница 47: ......
Страница 48: ......
Страница 69: ...BED AND BASE ASSEMBLY ITEM Part Name Amt Model 17 430 Model 19 480 Model 21 530 NO Used Part No Part No Part No...
Страница 75: ...HU 480 x 2200 VAC TOPLINE...
Страница 76: ......