Hussmann® Impact™ Hot Food Merchandiser
Installation
19
6. Bolt the cases together according to the sequence illustrated below.
Note: Make sure that no more than (2) threads are exposed when the cases are bolted
together. If this does occur, the bolt should be shortened, replaced with a shorter bolt or
capped off according to NSF specifications.
Use caution when installing fasteners around wiring.
a. Fasten the fronts together using 5/16-18 x 1 Hex Head Cap Screws, 5/16 Flat Washers and
5/16 Lock Washers.
b. Fasten the rear of the cases together at two locations shown above using 5/16-18 x 1
Hex Head Cap Screws, 5/16 Flat Washers, 5/16 Lock Washers and 5/16-18 Hex Nut.
c. Fasten the top rear of the cases together using 5/16-18 x 3 1/2 Cap Screws, 5/16 Flat
Washers, 5/16 Lock Washers and 5/16-18 Hex Nut.
Содержание SSWHI
Страница 7: ...Hussmann Impact Hot Food Merchandiser Introduction 5 Safety Labels...
Страница 29: ...Hussmann Impact Hot Food Merchandiser Notes 27 Notes...
Страница 30: ...Hussmann Impact Hot Food Merchandiser Notes 28...
Страница 31: ...Hussmann Impact Hot Food Merchandiser Notes 29...
Страница 32: ...P O Box 80400 Simpsonville S C 29680 0400 USA http www bkideas com Made and printed in the U S A LI0182 0604...