background image

Hussmann® Impact™ Hot Food Merchandiser 

Installation 

 

 

10 

Case Leveling 

Merchandisers must be installed level to ensure proper operation. During all steps of setting, joining and 
leveling cases, close attention to glass position and operation must be maintained. Please review all 
steps and photos before making any adjustments. DO NOT make any glass adjustments until individual 
case is set and level. 

Preparation 

1.  Using store blueprints, measure off and mark on floor the exact dimensions/locations of the case 

footprint. 
 

2.  Snap a chalk line for the front and rear positions of the base legs. 

 

3.  Mark the location of each joint from front to back lines. 

 

4. 

FLOORS ARE NOT LEVEL!!! 

When working with two or more cases to be joined, the whole 

lineup must be leveled on the same plane, left to right and front to back. This means that the 
entire lineup must be brought up to the level of the highest case in the lineup. 

 

Along the lines previously marked, find the highest point of the floor by: 
 

• 

Walking the floor and noticing any dips or mounds; 

• 

Using a string level; and 

• 

Using a transit. 

Leveler Adjustment 

Position the first case at the highest point. Set a long level (4 ft [1220 mm] or more) on the upper front 
panel of the case. Use an open-end wrench to turn leg levelers until the case is level from end to end and 
from front to back. Check all 6 legs on 8 ft (2438 mm) cases, or 8 legs on 12 ft (3658 mm) cases.  
 

Note: 

To avoid removing concrete flooring, begin lineup leveling from the highest point of the store floor 

 

 

Содержание SSWHI

Страница 1: ...Hussmann Impact Hot Food Merchandiser MODEL WDCHI SSWHI TSWHI CSWHI Installation Operation Manual Serial Numbers 121736 and Higher...

Страница 2: ...t of reinstalling the replacement or repaired part IN NO EVENT SHALL THE COMPANY BE LIABLE FOR LOSS OF USE LOSS OF REVENUE OR LOSS OF PRODUCT OR PROFIT OR FOR INDIRECT OR CONSEQUENTIAL DAMAGES INCLUDI...

Страница 3: ...lines 7 Unit Shutdown 7 Installation 8 NSF Certification 8 Location 8 Shipping Damage 9 Shipping Braces 9 Shipping Rider 9 Case Leveling 10 Preparation 10 Leveler Adjustment 10 Glass Positioning 11 Ra...

Страница 4: ...SF requirements Dow Corning RTV 732 Multi purpose Sealant Safety Precautions Always follow recommended safety precautions listed in this manual Below is the safety alert symbol When you see this symbo...

Страница 5: ...887 Outside the U S call 864 963 3471 Protect Children Keep children away from this equipment Children may not understand that this equipment is dangerous for them and others NEVER allow children to p...

Страница 6: ...ce services hospitals and the fire department near your telephone Know your responsibilities as an Employer Make certain your employees know how to operate the equipment Make certain your employees ar...

Страница 7: ...Hussmann Impact Hot Food Merchandiser Introduction 5 Safety Labels...

Страница 8: ...ntrol knob turned to the 12 o clock position as shown the heaters produce no heat To increase the temperature of the lower well heater rotate its control knob clockwise Likewise to increase the temper...

Страница 9: ...the product on display A thermometer should be used to read the internal temperature of each product The temperature control knobs should be set to the lowest possible number that will maintain the p...

Страница 10: ...duct should always be maintained at 145 F to maximize its display life Read before raising front glass The top cylinders which allow the raising and lowering of this glass have been carefully installe...

Страница 11: ...of a person Do not place heavy objects on the case Shipping Braces Note Be careful not to damage the factory installed end while moving the case Make sure that tools are positioned past the end and be...

Страница 12: ...4 FLOORS ARE NOT LEVEL When working with two or more cases to be joined the whole lineup must be leveled on the same plane left to right and front to back This means that the entire lineup must be bro...

Страница 13: ...ure the case has been leveled according to the Case Leveling procedure 2 Ensure that the glass handle is installed correctly Verify the glass is bottomed out the length of the handle A bowed handle in...

Страница 14: ...osed c Loosen the 8 set screws on the underside of the clamp hardware d Push the clamp hardware onto the glass until bottomed out e The clamp hardware must overhang the glass by an equal amount on eac...

Страница 15: ...with a razor knife Be sure that the remaining wiper gasket seals the gap Verify proper operation Raising Lowering Glass Using Adjustment Bolt If the glass still does not open or close correctly adjus...

Страница 16: ...is possible to access the adjusting bolt by using a small swivel socket without removing the stainless top liner To do this the stainless steel trim and foam noted in Step 8 must be removed 8 Remove...

Страница 17: ...rrectly re install components and hardware removed Note the doorframe is designed to have a tight fit A putty knife between the top of the frame and the insulated panel will help guide it into positio...

Страница 18: ...Hussmann Impact Hot Food Merchandiser Installation 16 Joining Instructions 1 Install the Top Gasket Pad Item 4 and DETAIL F and apply Silicone Item 3 and DETAIL H a...

Страница 19: ...iser has been set position the second so the end frames touch a Set a long level 4 foot or more on the upper front panel of the merchandisers Adjust case height by rotating the Adjustable Leg Leveler...

Страница 20: ...m 7 4 Use 8 18 x 3 8 Truss Head SM Screws Item 8 to fasten the plate using the predrilled pilot holes as shown below 5 Align the Rear Sill and attach Joining Bracket Item 9 with 10 24 x Washer Head Ma...

Страница 21: ...pped off according to NSF specifications Use caution when installing fasteners around wiring a Fasten the fronts together using 5 16 18 x 1 Hex Head Cap Screws 5 16 Flat Washers and 5 16 Lock Washers...

Страница 22: ...ndiser Installation 20 7 Apply a smooth continuous bead of silicone over the Exterior Top Joint A of the cases Continue sealing down the Rear Mullion Joint B of the cases and finally seal the Rear Sil...

Страница 23: ...Hussmann Impact Hot Food Merchandiser Installation 21 8 Install the Splashguard Joint Support Item 25 to the splashguard retainer using 8 x 1 2 Hex Head Sheet metal Screws Item 26...

Страница 24: ...s amperes printed on the serial number plate Actual ampere draw may be less than specified All electrical connections should be in compliance with the NEC and all applicable local codes by a licensed...

Страница 25: ...pleted install the splashguard and lower front panel Splashguards 1 At front of merchandiser attach a splashguard retainer bracket to each leg with sheet metal screws 2 Position top of splashguard ove...

Страница 26: ...uard Do not use additional fasteners or sealant to hold splashguards or panels in place To meet NSF cleaning requirements splashguards and panels must be removable without tools Installing Bottom Rear...

Страница 27: ...Case Refer to the cleaning procedure below Cleaning This unit should be cleaned at the end of each day Use the following procedure Failure to remove power from this unit may cause severe electrical sh...

Страница 28: ...rective action Defective Thermostat Contact an authorized BKI service agent for corrective action Loose Wire or bad Connection Contact an authorized BKI service agent for corrective action Holding Tem...

Страница 29: ...Hussmann Impact Hot Food Merchandiser Notes 27 Notes...

Страница 30: ...Hussmann Impact Hot Food Merchandiser Notes 28...

Страница 31: ...Hussmann Impact Hot Food Merchandiser Notes 29...

Страница 32: ...P O Box 80400 Simpsonville S C 29680 0400 USA http www bkideas com Made and printed in the U S A LI0182 0604...

Отзывы: