7 HANDLEBAR,CONTROLS
Main work
- Check the throttle cable routing.
Both throttle cables must be routed, side by side, behind
the handlebars and above the fuel tank bracket, to the
throttle valve body. Both throttle cables must be secured
behind the fuel tank contact area rubber band.
If the throttle cable is not routed as specified:
- Correct the throttle cable routing.
Finishing work
- Install the fuel tank. (
l!!ll
p. 104)
- Mount the seat. (
l!!ll
p. 1 02)
- Install the air filter box cover. (
tl!',!l
p. 97)
- Install the right side cover. (
tl!',!l
p. 101)
7 .6
Checking the play in the throttle cable
52
- Check the throttle grip for smooth operation.
- Move the handlebar to the straight-ahead position. Turn the
throttle grip back and forth slightly and determine the play in
throttle cable 6).
I Play in throttle cable
I 3 ... 5 mm (0.12 ... 0.2 in)
If the throttle cable play does not meet the specified
value:
- Adjust the play in the throttle cable. (
l!!ll
p. 53)
- Push the cold start button in all the way.
When the throttle grip is turned forward, the cold start but
ton returns to its original position.
If the cold start button does not return to its original posi
tion:
- Adjust the play in the throttle cable. (
l!!ll
p. 53)
Содержание F2303P0
Страница 1: ...PIONEERING SINCE 1903 REPAIR MANUAL2016 FS 450 Art no 3403034en Husqvarna MOTORCYCLES ...
Страница 2: ......
Страница 157: ...16 BRAKE SYSTEM Check the foot brake lever for a firm pressure point 155 ...
Страница 281: ...28 SERVICE SCHEDULE 279 ...