wc_tx002045gb.fm
40
Operation
CRT 48-33K
Continued from the previous page.
4. Apply a commercial leak test solution or a mixture of dishwashing liquid and
water to the hose connection.
5. Slowly rotate the knob on the discharge valve counterclockwise until the valve is
fully open.
6. Watch and listen carefully for indications of leaking LP. If a leak exists, bubbles
will form at the hose connection. Stop the leak before proceeding:
a. Close the discharge valve.
b. Disconnect and re-connect the hose, making sure the connection is tight.
c. Spray the hose connection with more leak test solution.
d. Slowly open the discharge valve and check again for leaks.
7. If there are no leaks, start the engine and run it for a few minutes to make sure
that LP is flowing smoothly.
Note:
Do not use the choke when starting or operating the machine with LPG.
The LP cylinder has now been installed and the machine is ready for use.
Содержание CRT48-33K
Страница 4: ...CALIFORNIA Proposition 65 Warning wc_tx004643en fm 4 Notes ...
Страница 8: ......
Страница 12: ...Table of Contents CRT 48 33K wc_bo5200004710_09TOC fm 12 ...
Страница 22: ...Labels CRT 48 33K 22 wc_si000649gb fm wc_gr0010124 HH GG LL H Q L Q H M BB Z F T S R B D KK N JJ E R BB M NN ...
Страница 32: ...Lifting and Transporting CRT 48 33K 32 wc_tx003110gb fm Notes ...
Страница 36: ...wc_tx002045gb fm 36 Operation CRT 48 33K 4 6 Control Component Locations wc_gr010112 o n m l ...
Страница 101: ...33 Notes 34 Notes ...
Страница 103: ...CRT 48 33K Schematics wc_tx002048gb fm 103 10 Schematics ...
Страница 106: ......