wc_tx002045gb.fm
33
CRT 48-33K
Operation
4
Operation
4.1
Preparing the Machine for First Use
1. Make sure all loose packaging materials have been removed from the machine.
2. Check the machine and its components for damage. If there is visible damage,
do not operate the machine. Contact your Wacker Neuson dealer immediately
for assistance.
3. Take inventory of all items included with the machine and verify that all loose
components and fasteners are accounted for.
4. Attach component parts not already attached.
5. Add fluids as needed and applicable, including fuel, engine oil, and battery acid.
6. Move the machine to its operating location.
4.2
Break-in Period
Overview
New engines require a break-in period to ensure maximum efficiency. During the
break-in period, the internal components of the engine wear slightly and develop a
tight seal.
The engine in this machine has a 50 hour break-in period.
Operating
during the
break-in
period
Follow the recommendations below while operating the machine during the break-
in period.
Allow the engine to warm up completely before operating the machine in cold
weather.
Change the engine oil and oil filter after 50 hours of operation. See topic
Engine
Oil and Filter
in the “Maintenance” chapter.
Содержание CRT48-33K
Страница 4: ...CALIFORNIA Proposition 65 Warning wc_tx004643en fm 4 Notes ...
Страница 8: ......
Страница 12: ...Table of Contents CRT 48 33K wc_bo5200004710_09TOC fm 12 ...
Страница 22: ...Labels CRT 48 33K 22 wc_si000649gb fm wc_gr0010124 HH GG LL H Q L Q H M BB Z F T S R B D KK N JJ E R BB M NN ...
Страница 32: ...Lifting and Transporting CRT 48 33K 32 wc_tx003110gb fm Notes ...
Страница 36: ...wc_tx002045gb fm 36 Operation CRT 48 33K 4 6 Control Component Locations wc_gr010112 o n m l ...
Страница 101: ...33 Notes 34 Notes ...
Страница 103: ...CRT 48 33K Schematics wc_tx002048gb fm 103 10 Schematics ...
Страница 106: ......