Complete Service and Repairs Before
Machine is Released
Tighten all bolts, fittings, and connections to torques
specified by the manufacturer.
Inspect for leftover components such as cotter pins,
washers, locknuts, etc. after completing service.
Replace any missing parts.
Start the engine and check for leaks. (See page 27,
Hydraulic System Hazards
.) Operate all controls to
make sure the machine is functioning properly. Test
the machine if necessary. After testing, shut down and
check the work you performed.
Recheck all fluid levels before releasing the equipment
for operation.
All parts should be inspected during repair and replaced
if worn, cracked or damaged. Excessively worn or
damaged parts could fail and cause injury or death.
Install all guards, covers, and shields after servicing.
Refill and recharge pressure systems only with
manufacturer-approved or recommended fluids.
Verify service work
when completed
Pressurized fluid
can inject into
the body
31
Perform Maintenance Safely
31
32
Notes
Содержание CRT48-33K
Страница 4: ...CALIFORNIA Proposition 65 Warning wc_tx004643en fm 4 Notes ...
Страница 8: ......
Страница 12: ...Table of Contents CRT 48 33K wc_bo5200004710_09TOC fm 12 ...
Страница 22: ...Labels CRT 48 33K 22 wc_si000649gb fm wc_gr0010124 HH GG LL H Q L Q H M BB Z F T S R B D KK N JJ E R BB M NN ...
Страница 32: ...Lifting and Transporting CRT 48 33K 32 wc_tx003110gb fm Notes ...
Страница 36: ...wc_tx002045gb fm 36 Operation CRT 48 33K 4 6 Control Component Locations wc_gr010112 o n m l ...
Страница 101: ...33 Notes 34 Notes ...
Страница 103: ...CRT 48 33K Schematics wc_tx002048gb fm 103 10 Schematics ...
Страница 106: ......