17
3. Refilling Nitrogen (N
2
) Gas
a. Perform paragraph 2 procedure.
b. Remove the cap on the gas charger, nitrogen hose connection port. See Fig 9.
c. Attach the N
2
gas pressure regulator to the gas container. Connect the nitrogen
(N
2
) Supply tank to the gas charger with the charging kit hose.
Figure 9. Gas Charger Valve
d. Open the main gas valve on the N
2
gas container and regulate the N
2
gas pressure
(see Figure 8.)
e. Turn the gas charger “T” handle clockwise and adjust N
2
gas pressure in the gas
chamber to the correct gas pressure shown on Table 10, Page 26.
f. Turn the gas charger “T” handle fully counter clockwise and remove the hose.
Attach the cap to the gas inlet of the charger.
g. Remove the gas charger and attach the gas valve cap and “O” ring firmly to the
gas valve nut on the hammer back cap.
Содержание HH100
Страница 1: ...HUSKIE HYDRAULIC HAMMERS SERVICE MANUAL HH100 HH150 2 HH300 2 HH500 2 HH750 2 HH1000 2 ...
Страница 2: ...2 ...
Страница 33: ...33 9 PARTS LIST AND ILLUSTRATIONS HH100 HH150 2 HH300 2 HH500 2 HH750 2 HH1000 2 ...
Страница 35: ...35 HH100 HAMMER Effective 07 09 ...
Страница 37: ...37 ...
Страница 39: ...39 HH150 2 HAMMER S N 001 099 2B2 1000 UP Effective 07 09 ...
Страница 41: ...41 ...
Страница 43: ...43 HH300 2 HAMMER S N 001 099 2E2 1000 UP Effective 07 09 ...
Страница 47: ......
Страница 49: ...49 HH500 2 HAMMER S N 001 099 2R2 1000 UP Effective 07 09 ...
Страница 55: ...55 HH750 2 HAMMER S N 001 099 2F2 1000 UP Effective 07 09 ...
Страница 59: ...59 ...
Страница 61: ...61 Effective 07 09 HH1000 2 HAMMER S N 001 099 2H2 1000 UP ...