10
UNDERWATER OPERATION
Operation of hydraulic hammers under water requires proper preparation to prevent
internal damage to hammer parts and carrier hydraulic system.
1. To prepare the hammer for underwater operation you will need
an external compressed air supply.
a. For HH100 through HH500-2, 5 –10 CFM at 50 to 90 psi is
adequate.
b. For HH750-2 and HH1000-2, 20 to 50 CFM is required.
2. Connect air supply line to front cap threaded port (remove plug
P/N 3Z01-FP0038 as shown.) Thread is 3/8 inch pipe tapered.
3. Set pressure regulator to 50 – 90 psi.
4. Maintain air supply to hammer at all times when operating
under water
PRESSURE REGULATOR
Figure 3. Air Compressor Supply
Содержание HH100
Страница 1: ...HUSKIE HYDRAULIC HAMMERS SERVICE MANUAL HH100 HH150 2 HH300 2 HH500 2 HH750 2 HH1000 2 ...
Страница 2: ...2 ...
Страница 33: ...33 9 PARTS LIST AND ILLUSTRATIONS HH100 HH150 2 HH300 2 HH500 2 HH750 2 HH1000 2 ...
Страница 35: ...35 HH100 HAMMER Effective 07 09 ...
Страница 37: ...37 ...
Страница 39: ...39 HH150 2 HAMMER S N 001 099 2B2 1000 UP Effective 07 09 ...
Страница 41: ...41 ...
Страница 43: ...43 HH300 2 HAMMER S N 001 099 2E2 1000 UP Effective 07 09 ...
Страница 47: ......
Страница 49: ...49 HH500 2 HAMMER S N 001 099 2R2 1000 UP Effective 07 09 ...
Страница 55: ...55 HH750 2 HAMMER S N 001 099 2F2 1000 UP Effective 07 09 ...
Страница 59: ...59 ...
Страница 61: ...61 Effective 07 09 HH1000 2 HAMMER S N 001 099 2H2 1000 UP ...