![HURST ML-630-SI Скачать руководство пользователя страница 27](http://html1.mh-extra.com/html/hurst/ml-630-si/ml-630-si_instruction-manual_2187527027.webp)
27
ATTENTION!
Since HURST hydraulic units are designed for top performance, only those
components in the replacement parts lists for the relevant unit can be replaced.
Any other components in the unit may only be replaced if:
- You have participated in an appropriate HURST service training course.
- You have the express permission of HURST customer service (upon request,
we will check for the grant of permission. Examination in each individual case
necessary!)
When cleaning units and equipment, note that no cleaning agent may be used
that has a pH value outside the range 5 - 8!
ATTENTION!
Attention must be paid to ensuring that no operating
À
uids can escape from
units with combustion engines during repair work!
11.2 Service work on the hydraulic unit
11.2.1 Care
instructions
The exterior of the device must be cleaned from time to time (
not the electrical contacts)
and the metallic surfaces (
not the electrical contacts)
must be treated with a suitable agent
to protect against corrosion.
(In case of doubt, contact your authorised HURST dealer or HURST directly!)
11.2.2 Function and load test
If there is any doubt regarding the safety or reliability of the equipment, a function and stress
test must also be performed.
HURST offers appropriate testing equipment for this.
11.2.3 Replacing the hydraulic fl uid
- After approx. 200 deployments, but after three years at the latest, replace the hydraulic
À
uid.
- The
À
uid should be replaced after it has warmed up.
- The engine must be switched off!
- The used hydraulic
À
uid must be disposed of properly.
Содержание ML-630-SI
Страница 2: ...2...
Страница 44: ...44 14 EC Declaration of Conformity...
Страница 45: ...45 15 Notes...
Страница 46: ...46...
Страница 47: ...47...