ULTRASOUND EQUIPMENT USER MANUAL
19
Chapter 4 Instrument Installation
4.1 Open packing box
Should take the instrument from the top of the packing box, after open the plastic bags, take the top
handle of the instrument at upward direction.
4.2 check
Should check whether there is any shipping damage on instrument or not.
43 Install Caution
In equipment installation, please observe the following precautions
:
Install Caution
Warning
1. Unpacking inspection if there is problem with the instrument or the probe; it is prohibited to
use to ensure safety.
2. Instruments shall be installed in a place where can avoid direct light display, also maintain
indoor ventilation and dust prevention.
3. The power supply circuit and the bearing capacity of the power supply socket range is
110V~240 V / 1.5 A.
4. If the power needs to use extended patch panel, please choose a product with the safety
certification.
Attention
1.
When unpacking and installation instrument to should take put down gently.
2.
Instruments used to 110 ~ 240V single-phase ac power supply, such as power grid voltage is
not stable, please add ac voltage stabilizer.
4.4 Install
4.4.1 Install Host Machine
Place the host in countertops or dedicated instrument cart, push in the direction shown by the arrow on
the box before the lock hook cap, open the front panel cover flat, then probe box installed on the host
is read from the packing foam.
4.4.2 Installation of the Probe
When installation, put the probe’s plug of the lock handle according to the figure 4-1 turns to a locking
state, the probe plug pins on the connector socket positioning hole, and then insert the plug of the
probe into the host of the connector socket, and lock the handle gently turning to lock state, then insert
the probe into the host on the back of the probe box.