9
from the system before connecting the water supplies.
Failure to do this
could result in debris entering the product and hindering performance.
5.
The plumbing connections should then be made to the HOT & COLD
water inlets (which are clearly marked).
6.
Make the plumbing connection to the water outlet. This will take the
water to the chosen auxiliary product (shower kit) you have selected to
run with this shower (fig 1).
7.
Turn on the water supply and check for leaks.
8.
Please make sure the shut off position is correctly set and that there is
no water coming from the valve when in the off position. If there is
please see the shut off position adjustment section.
9.
Check the max water temperature from the terminal fitting with a
thermometer. The recommended maximum terminal outlet is 47 °C
(116.6
°F)
. If you need to change the water temperature please see the
temperature adjustment section.
10.
Re fit the chrome sleeves to the shower body. Please tile up to the valve
as in fig 2.
11.
Apply a small bead of silicone behind the chrome concealing plate (this
will give a water tight seal so water cannot ingress into the wall cavity).
Slide the plate into position over the chrome sleeves, and fit up against
the finished wall surface.
12.
Fit the chrome control handles. The thermostatic control handle is
clearly marked with H & C. Your shower valve is now ready for use.
Содержание 1/2 NPT
Страница 4: ...3 2 DIMENSIONS ALL DIMENSIONS ARE APPROXIMATE DIMENSIONS ARE BASED ON A TYPICAL PLATE OPTION NPT NPT...
Страница 6: ...5 5 COMPONENTS NPT NPT...
Страница 18: ...17 5 COMPONENTES NPT de NPT de...
Страница 30: ...29 5 PI CES Raccord NPT de po Raccord NPT de po...
Страница 38: ...37...