Figure 5-75 Installing a filler panel
----End
Installing a FlexIO Card
Step 1 Wear an ESD wrist strap. For details, see
.
Step 2 Power off the server. For details, see
.
Step 3 Remove the power cables. For details, see
Step 4 Remove the server. For details, see
5.4.4 Removing the Server and Guide Rails
.
Step 5 Remove the filler panel. See
.
TaiShan 200 Server
Maintenance and Service Guide (Model 2280)
5 Removal and Installation
Issue 04 (2020-01-16)
Copyright © Huawei Technologies Co., Ltd.
136