Figure 5-28 Removing a PSU
Step 6 Place the removed PSU in an ESD bag.
Step 7 If a new PSU is not installed immediately, install a PSU filler. See
Figure 5-29 Installing a PSU filler
----End
TaiShan 200 Server
Maintenance and Service Guide (Model 2280)
5 Removal and Installation
Issue 04 (2020-01-16)
Copyright © Huawei Technologies Co., Ltd.
98