SUN2000-(5KTL, 6KTL)-M0
User Manual
4 Installation
Issue 03 (2019-07-19)
Copyright © Huawei Technologies Co., Ltd.
25
Figure 4-11
Determining hole positions
Step 2
Drill holes using a hammer drill.
You are advised to apply anti-rust paint on the hole positions for protection.
Figure 4-12
Drilling holes
Step 3
Secure the mounting bracket.