SUN2000-(55KTL, 60KTL) Series
User Manual
7 Man-Machine Interactions
Issue 06 (2020-01-03)
Copyright © Huawei Technologies Co., Ltd.
76
Parameter List
No. Parameter Description
Unit Default
Value
Value Range
Remarks
1
MPPT
multi-peak
scanning
When the SUN2000 is
used in scenarios
where PV strings are
obviously shaded,
enable this function.
Then the SUN2000
will perform MPPT
scanning at regular
intervals to locate the
maximum power.
N/A
Disable
Disable
Enable
The scanning
interval is set by
MPPT multi-peak
scanning interval
.
2
MPPT
multi-peak
scanning
interval
Specifies the MPPT
multi-peak scanning
interval.
min
15
[5, 30]
This parameter is
displayed only when
MPPT multi-peak
scanning
is set to
Enable
.
3
RCD
enhancing
RCD refers to the
residual current of the
SUN2000 to the
ground. To ensure
device security and
personal safety, RCD
should comply with
the standard. If an AC
switch with a residual
current detection
function is installed
outside the SUN2000,
this function should be
enabled to reduce the
residual current
generated during
SUN2000 running,
thereby preventing the
AC switch from
misoperations.
N/A
Disable
Disable
Enable
N/A
4
Reactive
power
output at
night
In some specific
application scenarios, a
power grid company
requires that the
SUN2000 can perform
reactive power
compensation at night
to ensure that the
power factor of the
local power grid meets
requirements.
N/A
Disable
Disable
Enable
This parameter is
configurable only
when
Isolation
is set
to
Input
ungrounded, with a
transformer
.