6
Commissioning
6.1 Checking Before Power-On
Table 6-1 Checklist
No.
Item
Acceptance Criterion
1
SUN2000 installation
The SUN2000 is installed correctly and
securely.
2
Smart Dongle
The Smart Dongle is installed correctly
and securely.
3
Cable routing
The cables are routed properly as
required by the customer.
4
Cable ties
Cable ties are secured evenly and no
burr exists.
5
Reliable grounding
The PE cable is connected correctly and
securely.
6
Switch
DC switches and all the switches
connecting to the SUN2000 are OFF.
7
Cable connection
The AC output power cable, DC input
power cables, battery cable, and signal
cable are connected correctly and
securely.
8
Unused terminals and ports Unused terminals and ports are locked
by watertight caps.
9
Installation environment
The installation space is proper, and
the installation environment is clean
and tidy.
SUN2000-(3KTL-10KTL)-M1
User Manual
6 Commissioning
Issue 02 (2020-11-20)
Copyright © Huawei Technologies Co., Ltd.
60