4
Installation
4.1 Checking Before Installation
Outer Packing Materials
Before unpacking the inverter, check the outer packing materials for damage, such
as holes and cracks, and check the inverter model. If any damage is found or the
inverter model is not what you requested, do not unpack the package and contact
your supplier as soon as possible.
NO TE
You are advised to remove the packing materials within 24 hours before installing the
inverter.
Package Contents
After unpacking the inverter, check that the contents are intact and complete. If
any damage is found or any component is missing, contact your supplier.
NO TE
For details about the number of contents, see the
Packing List
in the packing case.
SUN2000-(3KTL-10KTL)-M1
User Manual
4 Installation
Issue 02 (2020-11-20)
Copyright © Huawei Technologies Co., Ltd.
18