P&E
Connected to a DC
power supply device
•Both GE(o) and COMBO ports can receive/transmit
GE optical services.
•The P&E port can receive/transmit GE electrical
services.
1 to 4
GE(o)
5
7
8
NOTE
PWR
6
The RTN 380H can receive power signals from
either the DC power port (PWR) or the P&E
port. Power over the PWR port is used as an
example.
NOTE
Installing the RTN 380H
Grounded through
the ground clip
1.
Cover unused ports with caps/PG covers.
Retain removed caps for future use.
2.
Before installing the RTN 380H, remove the protective cover and film on the antenna port. Otherwise, the signal transmission will be affected.
3.
Different methods can be used to change the polarization direction of antennas. If the method provided in this document is not suitable for the type of antenna you have, use the method provided in the installation manual delivered with your antennas.
4.
The polarization direction of antennas is vertical by default. If the planned polarization direction is horizontal, change the polarization direction to horizontal.
5.
If an antenna with a diameter of 0.2 m, 0.3 m or 0.6 m is used in a direct mount scenario, you may install the RTN 380H on the antenna and then hoist them both into position on the tower.
6.
Before installing a cable, bind the cable section that links the cable connector to the pole. This will protect the cable connector from damage. Be sure that the length of cable running from the binding point to the RTN 380H is sufficient to attach the cable connector to
the Ethernet service port on the RTN 380H.
7.
To facilitate installation, install cables from left to right.
1
1+0 Scenario
Optional
:
Change the polarization direction
of the antenna to horizontal.
Follow the antenna use instructions to
install the antenna.
Install the PGND cable of the
RTN 380H.
Optional
:
Install an outdoor fiber.
1
2
Apply petroleum jelly around the exterior
side of the feed.
3
Install the RTN 380H on the antenna.
4
5
7
8
Install a GE cable.
Power on the RTN 380H.
1
Load NE data by using a USB
flash drive.
2
Use the Web LCT to load NE
data.
3
Align antennas.
4
• Install an outdoor fiber on the RTN 380H.
• Lay out the outdoor fiber.
•Attach a yellow outdoor label to the fiber according to the plan.
•Moistureproof the fiber.
16/17 >>
•Install the GE cable.
•Select a ground point for the GE cable.
• Install the ground clip.
• Lay out the GE cable.
•Attach a yellow outdoor label to the cable according to the plan.
Installation procedure
Site commissioning procedure
Connected to one GE (optical) service
Install the DC power cable.
6
Waterproof the ground clip.
9
Do anti-corrosion treatment for P&E ports, PWR ports and
GE ports.
10
Check the installation.
11
9
9
9
10
Grounded using
a ground clip
GE cable
10