21
No.
1
2
Teamwork
consisting of
two smart
cooling
products
Teamwork function
Enable
Enable
Teamwork group no.
1
1
Teamwork unit address
1
2
Total number of units
2
/
Number of running units
1 (1 standby smart cooling
product)
/
Forced Rotation
Yes
/
Requirement control
Competitive running avoidance
/
a. Teamwork function
:
Disable
indicates that the smart cooling product operates separately.
Enable
indicates that the smart cooling product operates in team with other smart cooling
products.
b. Teamwork group no.
: One ECC800 supports a maximum of four teamwork control groups. To
increase the response speed, it is recommended that one teamwork control group is connected.
3. Set teamwork parameters.
No.
1
2
3
Teamwork
consisting of
three smart
cooling
products
Teamwork function
Enable
Enable
Enable
Teamwork group no.
1
1
1
Teamwork unit address
1
2
3
Total number of units
3
/
/
Number of running units
2 (1 standby smart cooling
product)
/
/
Forced Rotation
Yes
/
/
Requirement control
Competitive running avoidance
/
/
•
The T/H control type, temp set point, humid set point and cold-aisle sensor or hot-aisle sensor
parameters can be modified based on site requirements. Other parameters cannot be modified
casually, and the modification must be authorized by Huawei engineers.
•
0101 in NetCol5000-A0101 is variable and subject to changes with the smart cooling product
connection sequence. The displayed value prevails.
Initial Configuration
11.2
1. Log in to the WebUI of the ECC800 controller as admin and enter the preset password
Changeme
.
2. Choose
Monitoring
>
Air Conditioner > NetCol5000-A0101
>
Running Parameters
>
T/H
Sensor Parameters
to view and modify temperature and humidity parameters.
Before starting the compressor, ensure that the electric heating belt of the crankcase have been
preheated for more than 12 hours. Otherwise, the compressor will be damaged. Huawei will not
be liable for any consequences.
1. Switch on the circuit breakers for the indoor and outdoor units on the upstream electric
control box.
2. Commission the system after the smart cooling product has been preheated for 12 hours.
Equipment Power-On
11.1
Содержание NetCol5000-A011
Страница 14: ...13 Downward pipe routing ...