18
No. Cable Name
From
To
1
Electric heater contactor
cable (required if an electric
heater is configured)
Converged cabinet XT4-6 and XT4-
5 correspond to smart cooling
products 1 and 2, respectively. The
third smart cooling product is not
configured with this cable by
default.
Contactor KM1 of the
corresponding smart cooling
product
The third smart cooling
product is not configured
with this cable by default.
2 Control unit input power
cable
Converged cabinet XT4-4
INPUT1 port on the control
unit
3 Outdoor unit power cable (3
x 6 mm
2
)
L (converged cabinet XT4-1, XT4-2,
and XT4-3 correspond to outdoor
units 3, 2, and 1, respectively.), N
bar, PE bar
L, N, and ground ports on
the electric control box of
the outdoor unit
4
Signal cable for the indoor
and outdoor units (3 cores
outdoor shielded cable, 16-22
AWG)
X2.1, X2.2, and X2.3 ports on the
indoor unit
P, Q, and E ports on the
electric control box of the
outdoor unit
5 J1 cable
X101, X102, and X103 ports on the
indoor unit
J1 port on the control unit
6 J2 cable
X101, X102, and X103 ports on the
indoor unit
J2 port on the control unit
7 Control unit output power
cable
X1.1, X1.2, X1.3, and FU1-FU3 ports
on the indoor unit
OUT1 port on the control
unit
8 J3 cable
X101, X102, and X103 ports on the
indoor unit
J3 port on the control unit
9 J4 cable
X101, X102, and X103 ports on the
indoor unit
J4 port on the control unit
10 Temperature/Humidity (T/H)
sensor cable
RS485/12V port on the control unit T/H sensor
11 ECC800 cable
FE-2 port on the control unit
•
If the smart ETH gateway
is configured, connect the
cable to the PoE port on
the smart ETH gateway.
•
If no smart ETH gateway
is configured, connect the
cable to the WAN_2 port
on the ECC800.
12 Ground cable
Ground point on the control unit
IT cabinet ground copper
bar
8
Verifying the Installation
•
Do not pull cables J1, J2, J3, and J4 and their terminals casually. Ensure that the cables
are connected securely.
•
If there are only two smart cooling products in the converged cabinet, you only have to
connect cables 3, 4, and 10, since other cables are factory-installed. If there are three
smart cooling products, all cables except 1 to the third smart cooling product have to
be connected onsite.
•
The length of signal cable for the indoor and outdoor units cannot exceed 200 meters.
•
The signal cable should be shielded, and the shield layer shall be grounded.
Содержание NetCol5000-A011
Страница 14: ...13 Downward pipe routing ...