Figure 3-26
Remove 4 screws
Step 2
Remove the in-ceiling mounting bracket.
Figure 3-27
Remove the in-ceiling mounting bracket
Step 3
Screw 4 bolts onto the back box by a Phillips screwdriver.
Figure 3-28
Install the bolts
----End
Wiring For Ceiling Mounting Applications
The cables of dome can be routed either from the top or the side of the back box. For the cables
routed from the top of the back box, it is required to drill a cable hole in the ceiling.
IPC6512-Z30&6522-Z30&6622-Z30
Installation Guide
3 Installation
Issue 02 (2014-12-25)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
21