FusionModule1000A20 Prefabricated All-in-One Data
Center
Installation Guide
7 Installing a Cable Outside a Pre-fab. Module
Issue 02 (2020-01-15)
Copyright © Huawei Technologies Co., Ltd.
72
Figure 7-2
Bottom cabling
After bottom cabling is completed, use sealing putty to seal the cable holes.
Step 3
Connect the PDB input power cables.