FusionModule1000A20 Prefabricated All-in-One Data
Center
Installation Guide
6 Installing Devices Inside the Pre-fab. Module
Issue 02 (2020-01-15)
Copyright © Huawei Technologies Co., Ltd.
59
Figure 6-25
Installing the Micro SD and SIM card
4.
Reinstall the ECC800 main control module in the ECC800 subrack.
Step 2
Attach the 4G antenna to the top of the cable feeder window on the pre-fab. module.
After routing the 4G antenna cable into the pre-fab. module through its ELV feeder
window (No. 8), seal the port in the feeder window using sealing putty.
The cable outside the pre-fab. module needs to be fit with a corrugated metal hose. For
details, see
A.1 Cable Installation Techniques
The cable outside the pre-fab. module can be bent only in the U-shape.
Figure 6-26
Installing the 4G antenna
Step 3
Attach the RF_Z antenna on the top of the monitoring box.