![Huawei 5288 V3 V100R003 Скачать руководство пользователя страница 62](http://html.mh-extra.com/html/huawei/5288-v3-v100r003/5288-v3-v100r003_user-manual_169672062.webp)
3
Installing and Removing the 5288 V3
About This Chapter
This topic describes the precautions and procedures for installing and removing the 5288 V3.
3.5 Connecting External Cables
3.1 Installation Overview
NOTE
For details about the safety instructions during the process of installing or replacing a server or its parts,
see "Safety" in the
Server Product Documentation
.
Installation Rules
The 5288 V3 is 4U high and can be installed in a standard 19-inch cabinet. The server can be
installed on L-shaped, adjustable, and holding rails, and is stackable. If the cabinet has
sufficient space, a distance of 1U or more can be reserved between servers.
Installation Process
Understand the entire installation process before installing the 5288 V3.
process for installing the 5288 V3.
5288 V3 Server
User Guide
3 Installing and Removing the 5288 V3
Issue 26 (2018-11-19)
Copyright © Huawei Technologies Co., Ltd.
52