Figure 7-90
Installing fan module brackets
Step 16
Install the fan modules. For details, see
.
Step 17
Install the air duct. For details, see
Step 18
Install the riser cards. For details, see
Step 19
Install the supercapacitor if it is required. For details, see
7.35 Installing the Supercapacitor
Step 20
Install the chassis cover. For details, see
7.12 Installing the Chassis Cover
Step 21
Install the 5288 V3. For details, see
.
Step 22
Connect all internal cables such as power and network cables. For details, see
Step 23
Power on the 5288 V3. For details, see
Step 24
(Optional) To burn the original equipment serial number (ESN) into the new mainboard after
replacement, contact Huawei engineers.
NOTE
If original device SN is not burnt in the new mainboard, the iBMC and OS cannot obtain the device SN.
This may affect the running of some services or the monitoring and management on the device.
Step 25
(Optional) Configure the server.
l
If the iBMC and BIOS configuration data is exported before the mainboard replacement,
import the data to the server and configure the password. For details, see
Import/Export
in the
Huawei Server Firmware Upgrade Guide
.
l
To upgrade the firmware (iBMC, BIOS, and CPLD) of the mainboard after replacement,
see the
Huawei Rack Server iBMC User Guide