DISCHARGE ARRANGEMENTS: HRP 30 - 80
Contractor:
Date:
Drawing Number:
103
Engineer:
Project:
Revision: Sept 2001
NOTES:
- Any combination of discharge arrangements are available
- Supply Riser is towards the center line of unit
- All Handings determined looking at return air opening
R- Right
B - Back
T- top
L - Left
F - Front
See Schedule
for
Unit Handing