![HTS HRP 30 C 2 Скачать руководство пользователя страница 3](http://html1.mh-extra.com/html/hts/hrp-30-c-2/hrp-30-c-2_installation-and-maintenance-manual_2179532003.webp)
Installation
General
1. To prevent damage this equipment should not be operated for supplementary heating and
cooling during the construction period.
2. Inspect the cartons and pallets for any specific tagging numbers indicated by HTS Engineering
per a request from the installing contractor. At this time the voltage, phase and capacity should
be checked against the plans.
3. Check tagging numbers against the plans to ensure unit installation in the correct location.
4. The installing contractor will find it beneficial to confer with piping, sheet metal, ceiling and
electrical foremen, together, before installing any conditioners.
Chassis
It is recommended that a piece of rubber or neoprene pad material, 112" (13mm)
maximum thickness, be placed under the unit cabinet.
Remove chassis from its carton. Remove compressor hold-down bolts from bottom of
chassis.
Connect electrical quick connect plug to matching receptacle on the cabinet mounted
control box.
Slide the chassis into the cabinet until the outside flanges are flush with the front. Install the
coil blockoff panel
Return Air Door
Screw architectural acoustical front panel to the dry wall furring as per detail in shop drawings.