t.
01923 232335
www.hrshevac.co.uk
7 of 48
HRS Hevac Ltd AquaModule AMB
Installation, Operating & Instruction Manual
3.3 Installation
of
an
A
TXD0RGXOH$0%6 '
(Instantaneous) units
The tap water modules should be installed according to the following schematics.
Picture 5
REP
DESIGNATION
REP
DESIGNATION
A
Primary inlet
HE
Heat Exchanger (PHE)
B
Primary Outlet
PP
Primary pump (single/double)
CW
Cold water inlet
PR
Recycling pump (option)
V3V
Mixing 3 port control valve with actuator
V
/V’
Manual gate valve
PRV
Pressure relief valve
S1
DHW temperature sensor (master)
Installation with primary water tank, limiting available generator capacity.