Chapter 3 Machenical Installation
Shenzhen Hpmont Technology Co., Ltd.
-
6
-
HD09 Series User Manual V1.1
3.2
Requirement for the Installation Site
Ensure the installation site meets the following
requirements:
•
Do not install at the direct sunlight, moisture,
water droplet location;
•
Do not install at the flammability, explosive,
corrosive gas and liquid locations;
•
Do not install at the oily dust, fiber and metal
powder location;
•
Be vertical installation on fire-retardant material
with a strong support;
•
Install at where the humidity is less than 95%RH
and non-condensing location;
•
Install at where the vibration is 3.5m/s
2
in 2 - 9Hz, 10m/s
2
in 9 - 200Hz (IEC60721-3-3);
•
This inverter meets IP20, and Pollution Degree level 2 (Dry, Non conducting dust pollution);
•
Make sure adequate cooling space for the inverter so as to keep the ambient temperature between
-10 - 40
℃
, as shown in the figure at the left;
It needs derating use if the inverter operation temperature exceeds 40
℃
. The derating value of the
output current of the inverter shall be 2% for each degree centigrade, Max. allowed temperature is
50
℃
.
≥100 mm
≥100 mm