11. Install the primary riser cage.
12. Connect the mini-SAS cables from the expander to SFF drive backplanes/Smart Array controller.
14. Install the server into the rack.
15. Connect all peripheral cables to the server.
16. Connect each power cord to the server.
17. Connect each power cord to the power source.
19. If removed, install the bezel.
The installation is complete.
Installing the M.2 SSD enablement option
Prerequisites
Before you perform this procedure, make sure that you have the following items available:
• T-15 Torx screwdriver
• Phillips No. 1 screwdriver
Procedure
1.
If installed,
2.
3.
Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
4.
Disconnect all peripheral cables from the server.
5.
Remove the server from the rack.
6.
7.
Hardware options installation
91
Содержание ProLiant DL325 Gen10 Plus
Страница 36: ...10 Remove the inner drive cage blank 11 Remove the fan wall covers 36 Operations...
Страница 37: ...12 For SFF drive cage remove the cable covers 13 Remove the drive cage latches Operations 37...
Страница 38: ...14 Remove the outer drive cage LFF SFF 38 Operations...
Страница 52: ...52 Operations...
Страница 67: ...3 Remove the drive blank LFF SFF 4 Prepare the drive LFF Hardware options installation 67...
Страница 119: ...SFF Cable routing Front I O LFF Cabling 119...
Страница 120: ...SFF Cable routing Serial port 120 Cabling...
Страница 122: ...Cable routing Energy pack 122 Cabling...