10. Connect the serial port cable.
11. If removed, install the secondary riser.
13. Install the server into the rack.
14. Connect all peripheral cables to the server.
15. Connect each power cord to the server.
16. Connect each power cord to the power source.
18. If removed, install the bezel.
The installation is complete.
Power supply options
Hot-plug power supply calculations
For hot-plug power supply specifications and calculators to determine electrical and heat loading for the server, see the
Hewlett Packard Enterprise Power Advisor website (
https://www.hpe.com/info/poweradvisor/online).
Installing a redundant hot-plug power supply
CAUTION: All power supplies installed in the server must have the same output power capacity. Verify that all
power supplies have the same part number and label color. The system becomes unstable and might shut down if it
detects different power supplies.
CAUTION: To prevent improper cooling and thermal damage, do not operate the server unless all bays are
populated with either a component or a blank.
104
Hardware options installation
Содержание ProLiant DL325 Gen10 Plus
Страница 36: ...10 Remove the inner drive cage blank 11 Remove the fan wall covers 36 Operations...
Страница 37: ...12 For SFF drive cage remove the cable covers 13 Remove the drive cage latches Operations 37...
Страница 38: ...14 Remove the outer drive cage LFF SFF 38 Operations...
Страница 52: ...52 Operations...
Страница 67: ...3 Remove the drive blank LFF SFF 4 Prepare the drive LFF Hardware options installation 67...
Страница 119: ...SFF Cable routing Front I O LFF Cabling 119...
Страница 120: ...SFF Cable routing Serial port 120 Cabling...
Страница 122: ...Cable routing Energy pack 122 Cabling...