9.
Insert the battery with the "+" side facing up on the socket, and then press the battery down to secure it in place.
11. Install the server into the rack.
12. Connect all peripheral cables to the server.
13. Connect each power cord to the server.
14. Connect each power cord to the power source.
16. If removed, install the bezel.
17. Properly dispose of the old battery.
For more information about battery replacement or proper disposal, contact an authorized reseller or support
specialist.
System battery replacement
137
Содержание ProLiant DL325 Gen10 Plus
Страница 36: ...10 Remove the inner drive cage blank 11 Remove the fan wall covers 36 Operations...
Страница 37: ...12 For SFF drive cage remove the cable covers 13 Remove the drive cage latches Operations 37...
Страница 38: ...14 Remove the outer drive cage LFF SFF 38 Operations...
Страница 52: ...52 Operations...
Страница 67: ...3 Remove the drive blank LFF SFF 4 Prepare the drive LFF Hardware options installation 67...
Страница 119: ...SFF Cable routing Front I O LFF Cabling 119...
Страница 120: ...SFF Cable routing Serial port 120 Cabling...
Страница 122: ...Cable routing Energy pack 122 Cabling...