![HPE ProLiant DL20 Gen10 Plus Скачать руководство пользователя страница 141](http://html.mh-extra.com/html/hpe/proliant-dl20-gen10-plus/proliant-dl20-gen10-plus_user-manual_2175802141.webp)
16. Connect the M.2 SSD SATA cables .
18. Install the server into the rack .
19. Connect all peripheral cables to the server.
20. Connect the power cords:
a. Connect each power cord to the server.
b. Connect each power cord to the power source.
21. Power up the server.
22. If removed, install the front bezel .
23. To configure the M.2 SSDs, see the OS-specific Intel VROC guide.
This installation is complete.
Installing the M.2 SATA SSD enablement option
141
Содержание ProLiant DL20 Gen10 Plus
Страница 20: ...DIMM slot location The arrow points to the front of the server DIMM slot location 20 ...
Страница 30: ...Fan numbering Fan numbering 30 ...
Страница 100: ...Installing an optical drive in the LFF drive chassis 100 ...
Страница 154: ...Cabling This chapter includes cabling guidelines and diagrams for internal component cabling Cabling 154 ...
Страница 169: ...Energy pack cabling Energy pack cabling 169 ...
Страница 174: ...M 2 SATA SSD add in card cabling 174 ...
Страница 176: ...Fan cabling Color Description Orange Fan 1 cable Blue Fan 2 cable Gold Fan 3 cable Fan cabling 176 ...
Страница 177: ...Chassis intrusion detection switch cabling Chassis intrusion detection switch cabling 177 ...
Страница 178: ...Serial port cabling Serial port cabling 178 ...
Страница 180: ...Power supply cabling 180 ...
Страница 185: ...Troubleshooting NMI functionality Troubleshooting resources Troubleshooting 185 ...
Страница 196: ...Ukraine RoHS material content declaration Ukraine RoHS material content declaration 196 ...