![HPE Cloudline CL3100 Gen10 Скачать руководство пользователя страница 68](http://html1.mh-extra.com/html/hpe/cloudline-cl3100-gen10/cloudline-cl3100-gen10_user-and-maintenance-manual_2175777068.webp)
Hardware options installation 68
PCIe switch boards
This section applies to 20 NVMe SSD model only.
Removing a PCIe switch board
To remove a PCIe switch board:
1.
Power down the server and detach all power cords from the power supplies.
2.
Remove the access panel (on page
3.
Disconnect the cables from the PCIe switch board. For additional cable information see page
4.
Remove the screws securing the PCIe switch board to the system board.
5.
Remove the PCIe switch board.
Содержание Cloudline CL3100 Gen10
Страница 14: ...Component identification 14 Cable Location 12 LFF HDDs 20 NVMe SSD...
Страница 32: ...Hardware options installation 32...
Страница 96: ...Software and configuration utilities 96...
Страница 200: ...Support and other resources 200 Turkey RoHS material content declaration Ukraine RoHS material content declaration...