Setup 24
WARNING:
When installing a server in a telco rack, be sure that the rack frame is adequately
secured at the top and bottom to the building structure.
Identifying the contents of the server shipping carton
Unpack the server shipping carton and locate the materials and documentation necessary for installing
the server. All the rack mounting hardware necessary for installing the server into the rack is included with
the rack or the server.
The contents of the server shipping carton include:
•
Server
•
Power cord
•
Rack-mounting hardware
In addition to the supplied items, you might need:
•
Operating system or application software
•
Hardware options
•
Screwdriver
Installing hardware options
Install any hardware options before initializing the server. For options installation information, refer to the
option documentation. For server-specific information, refer to
“Hardware options installation“ (on page
Installing the server into the rack
To install the server into a rack with square, round, or threaded holes, refer to the instructions that ship
with the rack hardware kit.
WARNING:
This server is heavy. To reduce the risk of personal injury or damage to the
equipment:
Observe local occupational health and safety requirements and guidelines for manual
material handling.
Get help to lift and stabilize the product during installation or removal, especially when the
product is not fastened to the rails. Hewlett Packard Enterprise recommends that a
minimum of two people are required for all rack server installations. A third person may be
required to help align the server if the server is installed higher than chest level.
Use caution when installing the server in or removing the server from the rack; it is unstable
when not fastened to the rails.
CAUTION:
Always plan the rack installation so that the heaviest item is on the bottom of the
rack. Install the heaviest item first, and continue to populate the rack from the bottom to the top.
Содержание Cloudline CL3100 Gen10
Страница 14: ...Component identification 14 Cable Location 12 LFF HDDs 20 NVMe SSD...
Страница 32: ...Hardware options installation 32...
Страница 96: ...Software and configuration utilities 96...
Страница 200: ...Support and other resources 200 Turkey RoHS material content declaration Ukraine RoHS material content declaration...