To replace the component, reverse the removal procedure.
Removing and replacing a primary riser card
CAUTION:
To prevent damage to the server or expansion boards, power down the server and
remove all AC power cords before removing or installing the PCI riser cage.
Procedure
.
2.
Remove all power:
a.
Disconnect each power cord from the power source.
b.
Disconnect each power cord from the server.
3.
Do one of the following:
a. Extend the server from the rack
.
b. Remove the server from the rack
.
.
106
Removal and replacement procedures
Содержание Cloudline CL2600 Gen10
Страница 62: ...VLAN Configuration Parameter Description Enter Configuration Menu VLAN VLAN Configuration 62 System utilities...
Страница 63: ...Driver Health Parameter Description Component UEFI driver Driver healthy status System utilities 63...
Страница 73: ...NVMe SSD Drives List System utilities 73...
Страница 103: ...b Remove the riser blank Full height Removal and replacement procedures 103...