• Avoid touching pins, leads, or circuitry.
• Always be properly grounded when touching a static-sensitive component or assembly.
Installation sequence and checklist
Step
Description
Completed
1
Perform site preparation (see
2
Install the server into a rack or pedestal.
3
Connect cables to the server.
a. Connect the AC input power cable.
b. Connect LAN core I/O cable.
c. Connect the iLO 3 MP LAN cable.
4
Connect and set up the console for access.
5
Power on the server.
6
From iLO MP, access UEFI.
7
Boot the operating system.
8
Using Smart Update Manager, download the latest firmware.
Installing the server into a rack or pedestal
Rack installation
Hewlett Packard Enterprise rack
Hewlett Packard Enterprise servers that are installed into racks are shipped with equipment-mounting
slides. The
HPE 2U Quick Deploy Rail System Installation Instructions for HPE Products
ships with each
set of slides. Follow the steps in this installation guide to determine where and how to install the server
into the rack.
For more information on rack deployment, stabilization and transportation, see the
10000 Series G2 Rack
Best Practices Guide
.
http://www.hpe.com/info/rackandpower
Non-Hewlett Packard Enterprise rack
For information on installing a HPE Integrity rx2800 i2 server in a third party rack, see the QuickSpecs
located on the rx2800 i2 server product page.
26
Installation sequence and checklist
Содержание AH395-9013J
Страница 13: ...Internal components Figure 1 Internal components Fans Processors DIMM expansion boards Internal components 13...
Страница 19: ...21 NIC 3 connector 22 NIC 4 connector 23 NIC link LED 24 NIC activity LED Overview 19...
Страница 186: ...2 Select Add License Key 3 Enter the license key and press Enter 186 Utilities...