
HP Z820 Workstation installation sequence recommendations
Table 3-10
Slot installation sequence
Load
order
Card description
Type
Slot
0
Slot
1
Slot
2
* Slot
3
* Slot
4
Slot 5 Slot 6
Slot
7
1
1st high performance GPU
Compute card
PCIe-
x16
2nd
1st
1
2
2nd high performance
GPU Compute card
(requires 2nd CPU and
1125w PSU)
PCIe-
x16
Only
3
1st PCIe graphics card
PCIe-
x16
Only
4
2nd PCIe graphics card
PCIe-
x16
2nd
1st
1
5
3rd PCIe graphics
(requires 2nd CPU)
PCIe-
x16
2nd
1st
6
4th PCIe graphics
(requires 2nd CPU and
1125w PSU)
PCIe-
x16
Only
7
Graphics test card
PCIe-
x16
1st
2nd
8
Controller card
PCIe-
x8
2nd
5th
4th
3rd
1st
2
9
Controller card with
battery
PCIe-
x8
2nd
5th
4th
3rd
1st
2
10
PCIe 1394 card
PCIe-
x1
Only
11
PCIe audio card
PCIe-
x1
1st
4th
5th
2nd
3rd
12
PCIe Network (LAN)
PCIe-
x1
1st
4th
5th
2nd
3rd
13
Mini SAS-4x bulkhead kit
N/A
1st
2nd
14
eSATA bulkhead kit
N/A
1st
2nd
* Slots 3 and 4 require second CPU.
1: If a second graphics card is used with a High Performance GPU Compute card, place the High Performance GPU
Compute card in Slot 6 and the second graphics in the alternate slot(s).
2: If a Controller card is being used with a High Performance GPU Compute card or second graphics card, place the
High Performance GPU Compute card/graphics card in Slot 6 and the RAID card in the alternate slot(s).
NOTE:
Slot sequenced from the rear I/O aperture to the board edge.
Component replacement guidelines
93
Содержание Z220 CMT Series
Страница 1: ...HP Z220 SFF Z220 CMT Z420 Z620 and Z820 Workstations Maintenance and Service Guide ...
Страница 4: ...iv About this guide ...
Страница 11: ...Index 185 xi ...
Страница 12: ...xii ...