Removal and replacement procedures 45
c.
Finish the installation by completely tightening the screws in the same sequence.
4.
Install the air baffle.
5.
Install the access panel.
6.
Do one of the following:
o
If the server is in a tower configuration, return the server to an upright position.
o
If the server is in a rack configuration, slide the server into the rack.
7.
Connect each power cord to the server.
8.
Connect each power cord to the power source.
9.
Power up the server ("
10.
Do one of the following:
o
For tower models, install the tower bezel.
o
For rack models, install the security bezel.
Processor
WARNING:
To reduce the risk of personal injury from hot surfaces, allow the drives and the
internal system components to cool before touching them.
CAUTION:
To prevent possible server malfunction and damage to the equipment,
multiprocessor configurations must contain processors with the same part number.
CAUTION:
The heatsink thermal interface media is not reusable and must be replaced if the
heatsink is removed from the processor after it has been installed.
IMPORTANT:
Processor socket 1 must be populated at all times or the server does not
function.
To remove the component:
1.
Do one of the following:
o
For tower models, open and remove the tower bezel ("
Содержание ProLiant ML350 Gen9
Страница 5: ...Contents 5 Index 123 ...
Страница 13: ...Customer self repair 13 ...
Страница 14: ...Customer self repair 14 ...
Страница 15: ...Customer self repair 15 ...
Страница 18: ...Illustrated parts catalog 18 ...
Страница 64: ...Removal and replacement procedures 64 LFF configuration SFF configuration ...
Страница 91: ...Component identification 91 o Rack orientation 24 LFF drives o Tower orientation ...
Страница 104: ...Cabling 104 Storage controller installed in slot 1 to 4 Storage controller installed in slot 6 to 9 ...
Страница 105: ...Cabling 105 HPE Smart Storage Battery cabling Power supply backplane cabling GPU power cabling ...
Страница 109: ...Cabling 109 Embedded SATA cabling LFF configuration SFF configuration ...
Страница 112: ...Cabling 112 o SFF configuration o LFF configuration SAS Expander cabling One SAS Expander ...
Страница 113: ...Cabling 113 o LFF configuration o SFF configuration ...
Страница 114: ...Cabling 114 Two SAS Expanders Express bay cabling Express bay bridge card installed in PCIe slot 3 ...