Hardware options installation 52
o
Single capacitor pack holder
o
Double capacitor pack holder
11.
Install the access panel (on page
20
).
12.
Install the server into the rack ("
Installing the server into the rack
" on page
30
).
13.
Connect each power cord to the server.
14.
Connect each power cord to the power source.
15.
Power up the server (on page
18
).
Redundant hot-plug power supply option
CAUTION:
All power supplies installed in the server must have the same output power capacity.
Verify that all power supplies have the same part number and label color. The system becomes
unstable and may shut down when it detects mismatched power supplies.
Содержание ProLiant DL560 Gen8
Страница 65: ...Cabling 65 Cabling SAS drive cabling ...
Страница 94: ...Support and other resources 94 ...
Страница 95: ...Support and other resources 95 ...