Hardware options installation 57
7.
Install the expansion board.
8.
Connect any required internal or external cables to the expansion board. See the documentation that
ships with the expansion board.
9.
Install the PCIe riser cage ("
Install the primary PCIe riser cage
" on page
22
).
10.
Install the access panel (on page
20
).
11.
Install the server into the rack ("
Installing the server into the rack
" on page
30
).
12.
Connect each power cord to the server.
13.
Connect each power cord to the power source.
14.
Power up the server (on page
18
).
Installing a full-length expansion board
WARNING:
To reduce the risk of personal injury, electric shock, or damage to the equipment,
remove the power cord to remove power from the server. The front panel Power On/Standby
button does not completely shut off system power. Portions of the power supply and some internal
circuitry remain active until AC power is removed.
1.
Power down the server (on page
18
).
2.
Remove all power:
a.
Disconnect each power cord from the power source.
b.
Disconnect each power cord from the server.
3.
Extend the server from the rack (on page
18
).
4.
Remove the access panel (on page
20
).
Содержание ProLiant DL560 Gen8
Страница 65: ...Cabling 65 Cabling SAS drive cabling ...
Страница 94: ...Support and other resources 94 ...
Страница 95: ...Support and other resources 95 ...