Operations 30
a.
Disconnect each power cord from the power source.
b.
Disconnect each power cord from the server.
3.
Extend the server from the rack (on page
23
).
4.
Remove the access panel (on page
25
).
5.
Remove any installed full-length expansion boards.
6.
Remove the PCIe riser cage.
To install the component, reverse the removal procedure.
Remove the secondary PCIe riser cage
CAUTION:
To prevent damage to the server or expansion boards, power down the server and
remove all AC power cords before removing or installing the PCIe riser cage.
To remove the component:
1.
Power down the server (on page
23
).
2.
Remove all power:
a.
Disconnect each power cord from the power source.
b.
Disconnect each power cord from the server.
3.
Extend the server from the rack (on page
23
).
4.
Remove the access panel (on page
25
).
Содержание ProLiant DL385p Gen8
Страница 6: ...Contents 6 Documentation feedback 132 Index 133 ...
Страница 51: ...Hardware options installation 51 19 Install the air baffle 20 Install the primary PCIe riser cage ...
Страница 65: ...Hardware options installation 65 o 8 or 16 drive SFF o 8 drive LFF ...
Страница 90: ...Cabling 90 Cabling SAS hard drive cabling SFF hard drive cabling SFF cabling with optional drive cage ...
Страница 91: ...Cabling 91 LFF hard drive cabling Optical drive cabling ...
Страница 92: ...Cabling 92 FBWC cabling 8 or 16 drive SFF 8 drive LFF ...
Страница 127: ...Support and other resources 127 ...
Страница 128: ...Support and other resources 128 ...