Operations 29
5.
If a full-length expansion board is installed in slot 1, release the full-length expansion board retainer,
and then remove the primary PCIe riser cage.
6.
If a full-length expansion board is installed in slot 4, release the full-length expansion board retainer,
and then remove the secondary PCIe riser cage.
7.
Remove the full-length expansion board.
To install the component, reverse the removal procedure.
Remove the primary PCIe riser cage
CAUTION:
To prevent damage to the server or expansion boards, power down the server and
remove all AC power cords before removing or installing the PCIe riser cage.
1.
Power down the server (on page
23
).
2.
Remove all power:
Содержание ProLiant DL385p Gen8
Страница 6: ...Contents 6 Documentation feedback 132 Index 133 ...
Страница 51: ...Hardware options installation 51 19 Install the air baffle 20 Install the primary PCIe riser cage ...
Страница 65: ...Hardware options installation 65 o 8 or 16 drive SFF o 8 drive LFF ...
Страница 90: ...Cabling 90 Cabling SAS hard drive cabling SFF hard drive cabling SFF cabling with optional drive cage ...
Страница 91: ...Cabling 91 LFF hard drive cabling Optical drive cabling ...
Страница 92: ...Cabling 92 FBWC cabling 8 or 16 drive SFF 8 drive LFF ...
Страница 127: ...Support and other resources 127 ...
Страница 128: ...Support and other resources 128 ...